A luxury kitchen at night with pendants, under-cabinet light, and toe-kick lighting. Not an Odin Electric project.

Odin Electric

Remodel and new-construction electrical

A remodel hides the electrical in the walls twice: once when the old work comes out, and again when the new rock goes up. The useful electrician is the one who is there for both, and who says what the service can carry before the cabinets are ordered.

Where we fit

This is wiring for kitchens, bathrooms, additions, whole-house remodels, and new houses in Volusia County and Palm Coast. It includes the temporary power, the service, the rough-in, the trim, and the lighting the plans actually call for. If the job includes a pool, that scope is on the pool and spa page . It is priced as electrical work.

  • Kitchen and bath rewires, including the circuits small appliances actually need
  • Additions and enclosed lanais
  • New custom homes and production homes when we are on the plans
  • Lighting, fans, and under-cabinet circuits
  • Service size decided before the air conditioner and the range are purchased

What makes remodel bids hard to compare

Square footage is a weak predictor. A 1,800-square-foot house with a new kitchen, a workshop, and an EV is a different panel from the same house with a coat of paint. Open walls are cheaper to wire than finished ones. A change after the rock is up is a different job from the same change on paper.

We do not price a remodel from a text message and a hope. Plans, or a walkthrough, come first. If another trade has already closed the wall, we will say what it costs to open it rather than fish blindly and call it included.

Odin does not publish a per-square-foot electrical price. Anyone who does, without seeing the plans, is selling a number that will move.

Permits are the schedule

New work and most alterations need a permit and inspections. The city, not a contractor’s habit, decides which edition of the Florida Building Code applies. Rough-in gets inspected before it disappears. If a builder asks to skip that so the drywall crew can start, the answer is no. A failed final is a harder conversation than a delayed rock day.

The service area pages name the building department for the cities we wrote up, and they say when the county is the office instead.

Where this work goes

The same license covers the cities below. None of those pages is a claim that we keep a crew there.

Questions people actually ask

Can you take over a job another electrician started?

Sometimes. We have to see what is in the walls and whose permit is open. We will not put our license on work we have not inspected, and we will not bad-mouth a contractor we have not met in order to win the call.

Do you design lighting?

We will lay out switching, loads, and code-required lighting with you or your designer. We are not an interior-design studio, and we will not pretend a fixture schedule is the same thing as a load calculation.

How long does a remodel rough-in take?

It follows the opening of the walls and the permit, not a slogan. We will put a sequence on the estimate after we see the plans. We will not promise a day-count for a house we have not walked.

Get a free estimate for remodel and new construction.

Say the city and what you want done. If the form is still disconnected, call. We would rather hear the job than miss it.

Call (386) 282-5840 Free Estimate